Mapped (unverified)colocation
Luleå Kommunhus
Luleå, Norrbottens län, Sweden
Source: Primary source
Luleå Kommunhus is a mapped data center in Norrbottens län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Norrbottens län
Overview
source: linkLuleå Kommun — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Sandström: Datacenter-bubblan är ingen valvinnareAffärsvärlden· Aug 30, 2026
- Sandström: Lyssna på Lind och Wykman – inte GoogleAffärsvärlden· Aug 23, 2026
- Oklart hur många jobb datacentret skapar: ”Behövs inte många”Norran· Aug 11, 2026
- Från idé till internationellt erkänd innovationsmiljö – ICE Datacenter firar tio årVia TT· Jun 17, 2026
- INSÄNDARE: Varför ska energislukande AI-center få fri tillgång till el?Tidningen Ångermanland· Apr 21, 2026
- Coromatic växer i norr när kraven på robusthet ökarNSD· Apr 15, 2026
See something wrong or missing on this page? Suggest a correction.