Mapped (unverified)colocation
Luleå Kommunhus
Luleå, Norrbottens län, Sweden
Source: Primary source
Luleå Kommunhus is a mapped data center in Norrbottens län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Norrbottens län
Overview
source: linkLuleå Kommun — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- INSÄNDARE: Varför ska energislukande AI-center få fri tillgång till el?Tidningen Ångermanland· Apr 21, 2026
- Coromatic växer i norr när kraven på robusthet ökarKuriren· Apr 15, 2026
- Stor lista: Här är Sveriges största datacenterDagens industri· Mar 25, 2026
- Ny miljardindustri växer fram: "Höjer elnotan – och tar ditt jobb"Affärsvärlden· Mar 9, 2026
- INSÄNDARE: Var inte naiva om datacenter – ställ jobbkrav på aktörenTidningen Ångermanland· Feb 24, 2026
- Luleå kan få nytt jättelikt datacenter vid kyrkbynKuriren· Nov 27, 2025
See something wrong or missing on this page? Suggest a correction.