Mapped (unverified)colocation
LIM Warsaw
Warsaw, województwo mazowieckie, Poland
Source: Primary source
LIM Warsaw is a mapped data center in województwo mazowieckie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Overview
source: linkLIM CENTER Spółka z ograniczoną odpowiedzialnością — colocation facility (252 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Inwestor próbował uspokoić nastroje. Wielka budowa centrum danych oburza mieszkańcówTVP Warszawa· Sep 30, 2026
- Reguły przeciw gigantycznej serwerowni. Kto stanie po stronie mieszkańców?TVP Warszawa· Sep 29, 2026
- Piaseczno. Trzy centra danych w jednej gminie? Ekspert: mogą konkurować o wodę i energię | TVN WarszawaTVN24· Sep 26, 2026
- Centrum danych w Bobrowcu zablokowane. Mieszkańcy dowiedzieli się o planach przypadkiemWarszawa Radio ESKA· Sep 23, 2026
- Kolejne data center pod Warszawą. Mieszkańcy nic nie wiedzieli. Droga miała wejść na ich działkiSuper Express· Sep 23, 2026
- "Albo osiedle, albo centrum danych". Co się stanie z terenem po fabryce płyt CD w Józefosławiu?Warszawa.Wyborcza.pl· Sep 23, 2026
See something wrong or missing on this page? Suggest a correction.