Mapped (unverified)colocation
Lefdal Mine Data Center
Måløy, Vestland, Norway
Source: Primary source
Lefdal Mine Data Center is a mapped data center in Vestland, Norway. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Vestland
Overview
source: linkLefdal Mine Datacenter AS — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- Nytt Måløy-selskap kjøper Local Host og NetPartner. Vil styrke miljøet i FlorøFirdaposten· Oct 7, 2026
- Satser på nytt: – Vi vet at det er muligfjt.no· Oct 7, 2026
- Myk makt i Meløy kommuneKlassekampen· Sep 22, 2026
- Næringsliv, Meløy | Har stått tomt siden konkursen – nå planlegges det datasenter i byggetAvisa Nordland· Sep 8, 2026
- Datasenter i gruve ble pengemaskinTechWatch· Jul 8, 2026
- Vil bygge stort datasenter hersmp.no· Jun 9, 2026
See something wrong or missing on this page? Suggest a correction.