Skip to content
DataCentersExposed
Mapped (unverified)

Lands End Cable Landing Station

Cornwall, United Kingdom

Source: OpenStreetMap

Lands End Cable Landing Station is a mapped data center in Cornwall, United Kingdom, operated by BT Group. DataCentersExposed has documented a 16,463 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
BT Group
Operator
BT Group
Est. capacity
~5-10 MW
Footprint
16,463 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Cornwall
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Lands End Cable Landing Station is a mapped data center in the United Kingdom, run by BT Group and noted in records as a BT data center. Its reported footprint is 16,463 square feet. No corporate parent above BT Group is listed in the available facts.

Operator chain

  • Ultimate parent
    BT Group
  • Files as
    BT Group
  • This facility
    Lands End Cable Landing Station

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%

National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.