Lands End Cable Landing Station
Cornwall, United Kingdom
Source: OpenStreetMap
Lands End Cable Landing Station is a mapped data center in Cornwall, United Kingdom, operated by BT Group. DataCentersExposed has documented a 16,463 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkLands End Cable Landing Station is a mapped data center in the United Kingdom, run by BT Group and noted in records as a BT data center. Its reported footprint is 16,463 square feet. No corporate parent above BT Group is listed in the available facts.
Operator chain
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Bharti Airtel looks to raise stake in BT – reportBeBeez International· May 22, 2026
- BT revives talks over international unit - reportData Center Dynamics· May 19, 2026
- BT Group: UK regulator probes BT over alleged failure to provide informationET Telecom· Apr 29, 2026
- BT and Nscale partner to build sovereign AI DCs with NVIDIA’s AI infrastructure in the UKW.Media· Apr 27, 2026
- How a BT, Nscale partnership plans to advance UK AI sovereigntycapacityglobal.com· Apr 24, 2026
- UK's BT and Nscale team up to build 14MW of AI capacityIndiatimes· Apr 24, 2026