Skip to content
DataCentersExposed
Under constructionAI / GPU compute

Lambda Kansas City AI Factory

Kansas City, Jackson County County, MO

Source: Primary source

Lambda Kansas City AI Factory is a under construction data center in Jackson County County, MO, operated by Lambda Labs. DataCentersExposed has documented 24 MW of reported power capacity at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Lambda Labs
Power
24 MW
Attribution & capacity confidence:mediumprimary source

Overview

source: link

$500M+ conversion of former BofA campus; 24MW launch, scalable past 100MW.

Operator chain

  • Files as
    Lambda Labs
  • This facility
    Lambda Kansas City AI Factory

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.6 mi
Unknown121750
Transmission line
0.6 mi
line
Municipal water
Served
Kansas City Pws

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Crossroads - Central Street in Kansas City, is 0.5 mi from this site (360 students). 7 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.