Mapped (unverified)colocation
Keppel Data Centres | Gore Hill Data Centre
Artarmon, New South Wales, Australia
Source: Primary source
Keppel Data Centres | Gore Hill Data Centre is a mapped data center in New South Wales, Australia. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
New South Wales
Overview
source: linkKeppel Data Centres Holding Pte Ltd — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Gateway plans $1bn, 81MW St Leonards data centreNorth Sydney Sun· Aug 20, 2026
- Recycled water, cut peak power use: State’s new rules for data centresThe Australian· Aug 18, 2026
- Two inquiries a week: Council floats water ban amid data centre surgeToowoomba Chronicle· Aug 17, 2026
- $50.3bn data centre boom faces tough new NSW rulesThe Daily Telegraph· Aug 16, 2026
- How to invest in Australia's data centre boommoneymag.com.au· Aug 14, 2026
- This CEO has built 40 AI clones and eats seven meals every dayAFR· Jul 31, 2026
See something wrong or missing on this page? Suggest a correction.