Mapped (unverified)colocation
KAMP Netzwerkdienste OBE1
Oberhausen, Nordrhein-Westfalen, Germany
Source: Primary source
KAMP Netzwerkdienste OBE1 is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkone.com Group AB and its subsidiaries — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- dogado Test 2026: Erfahrungen, Tarife und Bewertung!Cybernews· Sep 15, 2026
- Hochsicherheitszentrum in Oberhausen: Venenscanner sichert ZugangWAZ | Westdeutsche Allgemeine Zeitung· Apr 6, 2026
- Nachrichten für NRW: Bahnausfälle am Duisburger HauptbahnhofWDR· Mar 12, 2026
- Stromausfall in Rechenzentrum: Regelbetrieb läuft wieder anWDR· Mar 4, 2026
- Stromausfall in Rechenzentrum: Kommunen melden NRW-weit massive IT-ProblemePresseportal· Mar 3, 2026
- Colocation in Augsburg: LEW Green Data Center eröffnetB4B Schwaben· May 26, 2025
See something wrong or missing on this page? Suggest a correction.