Mapped (unverified)colocation
Junet Birka
Huskvarna, Jönköpings län, Sweden
Source: Primary source
Junet Birka is a mapped data center in Jönköpings län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Jönköpings län
Overview
source: linkJunet AB — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Saab flyttar från Huskvarna till jätteanläggning i JönköpingINDUSTRInyheter.se· Aug 28, 2026
- Spacex vill bygga datacenter i rymden – nästa årMetal Supply· Aug 25, 2026
- Storsatsning i Smedjebacken – datacenter kan ge 150 jobbMetal Supply· Aug 25, 2026
- Husqvarna avvecklar produktion för diamantverktygINDUSTRInyheter.se· May 7, 2026
- Husqvarna avvecklar verksamhet inom diamantverktygEFN· May 6, 2026
- Husqvarna utser ny chef för Construction-divisionenINDUSTRInyheter.se· Apr 24, 2026
See something wrong or missing on this page? Suggest a correction.