JPMorgan Chase is a mapped data center in Broomfield County, CO. DataCentersExposed has documented a 188,160 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Overview
source: linkJPMorgan Chase operates a mapped data center in Broomfield, Broomfield County, Colorado, with a reported footprint of 188,160 square feet. The site draws power from United Power, INC inside the WACM balancing authority. Available records do not detail ownership above JPMorgan Chase.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- New York won’t build big data centers for a year as it weighs energy and climate risksBroomfield Enterprise· Jul 14, 2026
- Broomfield approves temporary ban on data centersBroomfield Enterprise· Jul 12, 2026
- Appeals court reverses convictions after judge blocked defendant’s character witnessesColorado Politics· Jul 9, 2026
- Temporary data center moratorium approved in Broomfield – FOX31 DenverKDVR· Jul 9, 2026
- DPS Superintendent Alex Marrero misses cut for Miami-Dade jobColorado Politics· Jul 8, 2026
- Climate advocacy group urges New Mexico leaders to adopt a data center moratoriumMSN· Jul 8, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 17 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Denver-Boulder), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Prospect Ridge Academy in Broomfield, is 0.4 mi from this site (1,453 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.