Mapped (unverified)colocation
Jiuxianqiao-M7-Beijing
Beijing, China
Source: Primary source
Jiuxianqiao-M7-Beijing is a mapped data center in China. It runs on China's grid, which was 58% fossil-fuelled at 526 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
526 gCO₂/kWh
Clean electricity
42%
Region
China
Overview
source: linkINTERNET HARBOR — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
526 gCO₂/kWh
Clean electricity
42%
Fossil electricity
58%
National grid context, not this facility's own metering. Full country picture: China data centers.
In the news
source: Google News (local + English)- 北京全面加码Token经济产业建设,布局工厂与分发平台,依托超强算力底座,开启AI商业化全新增长周期新浪财经· Aug 7, 2026
- 美國各地AI資料中心抵制浪潮 川普控「北京煽動」世界新聞網· Aug 5, 2026
- 英特尔与AMD在北京承诺长期向中国数据中心供应服务器CPUМежа. Новини України.· Jul 23, 2026
- 20%涨停!北京将制定Token经济发展政策!算力租赁全线爆发证券时报· Jul 22, 2026
- 太空算力真火,创企3个月融资已3轮华尔街见闻· Jun 27, 2026
- $顺灏股份(SZ002565)$ 北京轨道辰光的太空卫星发射成功后,极有可能会反向要约收购002565(结合上交所新规:...雪球· Dec 27, 2025
See something wrong or missing on this page? Suggest a correction.