IT
Riverside County, CA
Source: OpenStreetMap
IT is a mapped data center in Riverside County, CA.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site, right now
source: CAISO · gridstatus- Solar62.2%
- Imports12.0%
- Wind7.6%
- Nuclear6.5%
- Natural Gas4.3%
- Hydro4.0%
- Geothermal2.2%
- Biomass1.2%
Real-time generation mix for the CAISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- WV DEP Reviews Gas Pipe Permits for Data Center in Mason CountyMarcellus Drilling News· Jun 16, 2026
- Meta Partners With Reliance on AI-Enabled Data Center in Indiameta.com· Jun 10, 2026
- World’s first wind-powered underwater datacentre starts operating in ChinaThe Guardian· Jun 9, 2026
- AI to double data centre power and water consumption by 2030, UN researchers sayReuters· Jun 3, 2026
- Duke starts construction on data center near Central CampusThe Duke Chronicle· Jun 1, 2026
- Kevin O'Leary wants to build a massive AI data centre in Utah. Some residents aren't happyCBC· May 23, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Gateway in Riverside, is 0.3 mi from this site. 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.