IONIC Digital Cedarvale

Ward County, TX

Source: OpenStreetMap

IONIC Digital Cedarvale is a mapped data center in Ward County, TX. DataCentersExposed has documented a 2,238,928 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Footprint
2,238,928 sq ft
Interconnection
~175 MW
Utility
Texas-New Mexico Power Co
Attribution & capacity confidence:mediumprimary source

Overview

source: link

IONIC Digital Cedarvale is a mapped data center in Ward County, TX, operating under the IONIC Digital banner. The site spans 2,238,928 square feet and draws power from Texas-New Mexico Power Co. Beyond that footprint and utility connection, public details about the project's ultimate corporate owner remain thin.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
0.2 mi
Unknown303834 · 69 kV
Transmission line
824 ft
69 kV line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.

source · All Texas subsidies →

Water use

Modeled estimate~3.3M gpd
Direct (onsite cooling)
~1.8M gpd
Indirect (its electricity)
~1.5M gpd

No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 2 L/kWh cooling (hot climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Who lives nearby

source: Census ACS 2023
Median household income
$73.5K
People of color
63%
Below poverty
9%
Tract population
4,138

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Haynes El in Pecos, is 6.8 mi from this site (403 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.