Skip to content
DataCentersExposed
Mapped (unverified)colocation

iomart DC3 Nottingham

Nottingham, City of Nottingham, United Kingdom

Source: Primary source

iomart DC3 Nottingham is a mapped data center in City of Nottingham, United Kingdom, operated by iomart. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
iomart
Operator
iomart
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
City of Nottingham
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

iomart Hosting Limited — colocation facility (3 networks present). Source: PeeringDB.

Operator chain

  • Ultimate parent
    iomart
  • Files as
    iomart
  • This facility
    iomart DC3 Nottingham

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%

National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.