Mapped (unverified)
Interactive Data Centre
New South Wales, Australia
Source: OpenStreetMap
Interactive Data Centre is a mapped data center in New South Wales, Australia, operated by Interactive. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Interactive
Operator
Interactive
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
New South Wales
Overview
source: linkInteractive Data Centre is a mapped data center site in Australia, run by the operator Interactive. Available records identify it only as an Interactive data center, with no ownership chain above the operator disclosed. No capacity, footprint, or environmental enforcement figures appear in the available record.
Operator chain
- Ultimate parentInteractive
- Files asInteractive
- This facilityInteractive Data Centre
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- Australia data centre firm NextDC reports rising water, energy use with profit beatThe Star· Aug 28, 2026
- Australia Q2 Business Investment Falls 3.6% as Data Centre Rush FadesUS News Money· Aug 27, 2026
- PM’s green grid decree faces $31bn test in QueenslandThe Australian· Aug 24, 2026
- Australia’s $150b data centre boom risks becoming an economic mirageAFR· Aug 24, 2026
- Goodman Group (ASX:GMG) Shares Trail A$2.675b Profit And Data Centre Pushsimplywall.st· Aug 21, 2026
- Data Center World Australia 2026Hitachi Energy· Aug 17, 2026
See something wrong or missing on this page? Suggest a correction.