Skip to content
DataCentersExposed
Mapped (unverified)

Interactive Data Centre

New South Wales, Australia

Source: OpenStreetMap

Interactive Data Centre is a mapped data center in New South Wales, Australia, operated by Interactive. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Interactive
Operator
Interactive
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
New South Wales
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Interactive Data Centre is a mapped data center site in Australia, run by the operator Interactive. Available records identify it only as an Interactive data center, with no ownership chain above the operator disclosed. No capacity, footprint, or environmental enforcement figures appear in the available record.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%

National grid context, not this facility's own metering. Full country picture: Australia data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.