InAsset Pordenone is a mapped data center in Friuli-Venezia Giulia, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Friuli-Venezia Giulia
Overview
source: linkInAsset Srl — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Viaggio nei data center italiani: quali sono, dove sono e di chi sonoIl Bo Live· May 4, 2026
- Nuovo data center al BIC incubatoriRaiNews· Mar 28, 2025
- Il quartiere di Milano che verrà scaldato grazie a internet (e non solo)MilanoToday· Aug 6, 2024
- Electrolux, al datacenter arrivano gli indiani: "Ci vogliono sostituire con lavoratori a basso costo"PordenoneToday· Jul 30, 2024
- DATA CENTER, fino a 15 miliardi entro il 2025. Lombardia battistrada sulle regoleDiario Infrastrutture e Ambiente Costruito· Jul 4, 2024
- Easy Wi-Fly: gli hot spot per abilitare nuove strategie di comunicazione. Con WindTre BusinessIndustria Italiana· Jun 28, 2024
See something wrong or missing on this page? Suggest a correction.