Mapped (unverified)colocation
IKB - Rechenzentrum2
Innsbruck, Tirol, Austria
Source: Primary source
IKB - Rechenzentrum2 is a mapped data center in Tirol, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Tirol
Overview
source: linkInnsbrucker Kommunalbetriebe AG — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Banken in Tirol teilweise lahmgelegttirol.ORF.at· Oct 6, 2026
- Mehrere österreichische Banken kämpften mit SystemausfallDer Standard· Oct 6, 2026
- Rechenzentrum in Nickelsdorf: Fortschritt für wen?Zeitung der Arbeit· Aug 16, 2026
- KI außer Kontrolle: OpenAI-Modell bricht ins Netz aus – Strombedarf explodiertexxpress· Jul 27, 2026
- Stärkster Supercomputer des Landes bereit für Businesskeymedia Wien· Jul 4, 2026
- Supercomputer MUSICA nimmt Betrieb aufUniversität Innsbruck· Jul 3, 2026
See something wrong or missing on this page? Suggest a correction.