Mapped (unverified)colocation
Groupe Cyllene - DC - Montigny les Bretonneux
Montigny-le-Bretonneux, Île-de-France, France
Source: Primary source
Groupe Cyllene - DC - Montigny les Bretonneux is a mapped data center in Île-de-France, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Île-de-France
Overview
source: linkCyllene SAS — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Montigny-le-Bretonneux : Répare Café de retour le 10 octobreInfosYvelines· Oct 4, 2026
- Vélizy-Villacoublay : la chaleur d'un data center va chauffer des logements étudiantsInfosYvelines· Sep 29, 2026
- A Vélizy-Villacoublay, ce futur data center chauffera la résidence étudiante !Le Parisien· Sep 29, 2026
- Data centers en Île-de-France : beaucoup d'électricité, peu d'emploismesinfos· Sep 7, 2026
- Environnement, social, intelligence… Pourquoi un data center géant inquiète ce collectif dans les YvelinesOuest-France· Sep 2, 2026
- « Ce n’est pas rassurant… » : le projet de « méga data center » inquiète dans les Yvelines, un collectif fait barrageActu.fr· Sep 2, 2026
See something wrong or missing on this page? Suggest a correction.