Green Energy Ventures Data Center
King George County, VA
Source: Primary source
Green Energy Ventures Data Center is a proposed data center in King George County, VA.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkProject covers more than one parcel, the acreage represents the combined acreage Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- U Power Hydro Data Joint Venture Receives "Data Center Power & Energy Solution" Recognition at DIF Awards 2026 in ThailandPR Newswire· Jun 1, 2026
- Meta Signs 1 GW Energy Storage Deal to Power Data CentersESG Today· Apr 23, 2026
- AG Nessel challenges approval of Washtenaw County data center contractsMLive.com· Apr 17, 2026
- A data center is being proposed in NW Colorado Springs, neighbors have concernsKOAA News 5· Apr 6, 2026
- Michigan Approves 1.3 GW Battery Portfolio, Including 332 MW Supporting Oracle‑OpenAI $16B AI Data Center in Saline TownshipConstruction Review· Apr 2, 2026
- Michigan approves 1.3 GW BESS portfolio, including contested Oracle data center assetsESS News· Apr 1, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Sealston Elementary in King George, is 2.4 mi from this site (754 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.