Glesys Pori 1 is a mapped data center in Satakunta, Finland. It runs on Finland's grid, which was 4% fossil-fuelled at 57 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
57 gCO₂/kWh
Clean electricity
96%
DC power price
6.53¢/kWh
Region
Satakunta
Overview
source: linkGlesys AB — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
57 gCO₂/kWh
Clean electricity
96%
Fossil electricity
4%
Data-center power price
6.53¢/kWh
A large data center in Finland pays 6.53¢/kWh for electricity — a household pays 23.19¢, 72% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Finland data centers.
In the news
source: Google News (local + English)- Datakeskukset | Satakunnassa jo 15 vuotta toiminut datakeskus piileksii yllättävässä paikassa – Tältä siellä näyttääSatakunnan Kansa· Feb 18, 2026
- Areenamoguli ja omaishoitaja – Jouko Harjunpää unelmoi isosti ja rakastaa syvästiNurmijärven Uutiset· Jun 24, 2024
- Datakeskukset | Harjunpään datakeskus siirtyy osaksi yli 160 miljardin dollarin sijoitusvarallisuuttaSatakunnan Kansa· Mar 15, 2024
- Harjunpään luolasto täyttyy palvelimista vajaassa kymmenessä vuodessaYle· Oct 23, 2017
- Ulvilan kallioon nousee suuri konesaliYle· Jun 14, 2011
See something wrong or missing on this page? Suggest a correction.