Mapped (unverified)colocation
Glesys Falkenberg 2
Falkenberg, Hallands län, Sweden
Source: Primary source
Glesys Falkenberg 2 is a mapped data center in Hallands län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Hallands län
Overview
source: linkGlesys AB — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Glesys ingår avtal med Trevian för etablering av nytt datacentercampus i Oulu, FinlandMynewsdesk· Jun 4, 2026
- Så kan AI-centren påverka energisystemetTidningen Energi· May 12, 2026
- Glesys förvärvar Vernes managed private cloud-verksamhet och två datacenter i FinlandMynewsdesk· Oct 14, 2025
- 40 miljoner investeras i hållbart datacenter i Falkenbergdagensinfrastruktur -· Jul 7, 2025
- Spillvärme från AI-drift värmer lägenheter till tusenNy Teknik· Oct 3, 2024
- GleSYS firar 25 framgångsrika år i branschenMynewsdesk· Sep 23, 2024
See something wrong or missing on this page? Suggest a correction.