Florido Tower is a mapped data center in Wien, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Wien
Overview
source: linkFLORIDO TOWER GMBH & CO. KG — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Keine UVP für Google-Rechenzentrum Kronstorf erforderlichVOL.AT· Sep 23, 2026
- NÖ: Rechenzentrum in Leopoldsdorf muss durch die UVPVienna.at· Sep 11, 2026
- The Line wird zurückgefahren: Saudi-Arabien setzt auf KI-RechenzentrenVienna.at· Aug 21, 2026
- Beschluss steht noch aus - Leopoldsdorf soll noch ein zweites Rechenzentrum bekommenNÖN.at - Niederösterreichische Nachrichten· Aug 18, 2026
- Wien verzichtet auf Bewerbung für AI GigafactoryTrending Topics· Aug 4, 2026
- CEO eines führenden Rechenzentrumsbetreibers als Hauptredner bei der Data Center World Europe angekündigtBusiness Wire· Aug 3, 2026
See something wrong or missing on this page? Suggest a correction.