Fibmesh Edge DC - Jmu 01
JAMMU, Jammu and Kashmir, India
Source: Primary source
Fibmesh Edge DC - Jmu 01 is a mapped data center in Jammu and Kashmir, India. It runs on India's grid, which was 73% fossil-fuelled at 671 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
671 gCO₂/kWh
Clean electricity
27%
Region
Jammu and Kashmir
Overview
source: linkFIBMESH IN LIMITED — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
671 gCO₂/kWh
Clean electricity
27%
Fossil electricity
73%
National grid context, not this facility's own metering. Full country picture: India data centers.
In the news
source: Google News (local + English)- Adani Enterprises, Jabil sign MoU for 50:50 JV to manufacture AI data centre hardware in IndiaThe Tribune· Oct 13, 2026
- US AI data centre startups raise USD 33.5 billion in 2026 amid power constraints: Morgan StanleyThe Tribune· Oct 13, 2026
- India’s power transmission expansion, data centre demand to drive capital goods growth: ReportThe Tribune· Oct 12, 2026
- CoreWeave enters India with 240 MW AdaniConneX data center deal in Navi MumbaiThe Tribune· Oct 8, 2026
- Astra Cybercity to Invest USD 3 Billion in Next-Generation Data Centre and Technology Campus in Ratnagiri, MaharashtraThe Tribune· Oct 5, 2026
- Kazakhstan aims to build ‘full-stack’ AI ecosystem, eyes 1 GW Data Center Valley: Minister MadiyevThe Tribune· Oct 2, 2026