Fibernet MercuryDelta Campus/Delta Gigasite
Delta, Millard County, UT
Source: Primary source
Fibernet MercuryDelta Campus/Delta Gigasite is a proposed data center in Millard County, UT, operated by Fibernet MercuryDelta. DataCentersExposed has documented 2,000 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkProposal to develop a 2GW, 20 million sq ft data center campus, relying on the 1.9GW IPP plant. Potentially expandable to 10GW wtih 500- 5GW+ battery storage. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Files asFibernet MercuryDelta
- This facilityFibernet MercuryDelta Campus/Delta Gigasite
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Ben McAdams has stock in a rural Utah data center. His primary opponents say it’s a problem.The Salt Lake Tribune· May 22, 2026
- HIGH COUNTRY NEWS: The big data center buildupMaven's Notebook· Nov 25, 2025
- Joule, Caterpillar Partner to Deliver Utah 4-GW Power and Hyperscale Computing CampusEngineering News-Record (ENR)· Aug 19, 2025
- ‘Golden Spike of the internet’: Why AI data centers are coming to DeltaABC4 Utah· Aug 15, 2025
- World's largest data center campus could be coming to central UtahKSL.com· Aug 14, 2025
- Largest data center in the world to be built in UtahOklahoma Energy Today· Aug 7, 2025
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Delta South School in Delta, is 7.0 mi from this site (361 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.