Mapped (unverified)colocation
Fiber 23
Rome, Lazio, Italy
Source: Primary source
Fiber 23 is a mapped data center in Lazio, Italy. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lazio
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkFiber 23 S.R.L — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Cybersecurity, un polo nazionale da oltre 2 miliardi e 800 impreseIl Messaggero· Jun 9, 2026
- L'Ue vuole una "etichetta" di sostenibilità per i data center: in arrivo nuove regole sui consumi di energia e acquaOpen· Jun 4, 2026
- I Data center di interesse nazionale, intesa tra Governo e Regione: percorso condiviso, anche per la scelta del commissarioIl Giorno· Jun 3, 2026
- Italia hub digitale del Mediterraneo: Schneider Electric e Digital Realty inaugurano ROM1, il data center ad alta efficienza per l’era AIIndustria Italiana· Jun 1, 2026
- La nuova missione di Erin Brockovich riguarda i data centerIl Post· Jun 1, 2026
- Data center in espansione | l’IA diventa il mezzo per la nascita di nuovi posti di lavoro?Zazoom Social News· May 29, 2026
See something wrong or missing on this page? Suggest a correction.