EVRY AS Gjøvik is a mapped data center in Innlandet, Norway. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Innlandet
Overview
source: linkEVRY Datacenter Gjøvik — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- Økonomi og næringsliv, Arbeidsliv | Hva gir datasenter tilbake til samfunnet?Østlendingen· Sep 21, 2026
- Debatt, Oa mener | Tøff prioriteringOppland Arbeiderblad· Sep 4, 2026
- Mener datasenter-avgjørelsen haster: – Kanskje det vinduet vi harOppland Arbeiderblad· Sep 2, 2026
- Frister med 100 arbeidsplasser: Nå er Toten i nasjonalt datasenter-kappløpOppland Arbeiderblad· Sep 2, 2026
- Datasenter, Gjøvik | Har fått henvendelser om dette i GjøvikOppland Arbeiderblad· Jun 30, 2026
- Langrenn, NM-langrenn | Mathilde Myhrvold med overbevisende løp – tok NM-gull på 5 kilometerNettavisen· Mar 28, 2026
See something wrong or missing on this page? Suggest a correction.