Mapped (unverified)
Euregiocenter
Aachen, Nordrhein-Westfalen, Germany
Source: OpenStreetMap
Euregiocenter is a mapped data center in Nordrhein-Westfalen, Germany. DataCentersExposed has documented a 7,273 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Footprint
7,273 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Unterirdischer "Bunker" von NetAachen: Größte Investition in sicheres RechenzentrumAachener Zeitung· Mar 19, 2026
- Fehler im Hochspannungsnetz sorgte für Stromausfall in Aachen – auch Ampeln betroffenAachener Zeitung· Mar 10, 2026
- Lokaler Stromausfall in Aachen blockierte landesweit Behörden in NRWBlackout News· Mar 8, 2026
- Die Regio-IT-Störung zeigt, wie abhängig und verletzlich wir sindAachener Zeitung· Mar 7, 2026
- Stromausfall in Rechenzentrum: Regelbetrieb läuft wieder anWDR· Mar 4, 2026
- Störung bei der Regio IT behoben: Systeme laufen wiederAachener Zeitung· Mar 4, 2026