Mapped (unverified)colocation
ESDS Bengaluru
Bangalore, Karnataka, India
Source: Primary source
ESDS Bengaluru is a mapped data center in Karnataka, India. It runs on India's grid, which was 73% fossil-fuelled at 671 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
671 gCO₂/kWh
Clean electricity
27%
Region
Karnataka
Overview
source: linkESDS Software Solution Ltd. — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
671 gCO₂/kWh
Clean electricity
27%
Fossil electricity
73%
National grid context, not this facility's own metering. Full country picture: India data centers.
In the news
source: Google News (local + English)- Karnataka data centre policy targets 1 GW IT load by 2031The Indian Express· Sep 18, 2026
- India’s data centre capacity quadruples in six years, tops APAC ranking: ReportThe Times of India· Aug 25, 2026
- Infineon to acquire Bengaluru-based C2i to boost AI data centre power businessThe Times of India· Aug 24, 2026
- Indian states are in a race for power grid dominance. The prize: data centre expansionThePrint· Aug 17, 2026
- Cloudflare Status: Bangalore Issue Resolved, No OutageTechgenyz· Aug 5, 2026
- HCLTech to invest Rs 14,257 cr in Odisha AI data centreThe Times of India· Jul 24, 2026
See something wrong or missing on this page? Suggest a correction.