Mapped (unverified)colocation
Eircom Dublin (Citywest)
Dublin, Dublin, Ireland
Source: Primary source
Eircom Dublin (Citywest) is a mapped data center in Dublin, Ireland. It runs on Ireland's grid, which was 52% fossil-fuelled at 257 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
257 gCO₂/kWh
Clean electricity
48%
DC power price
22.51¢/kWh
Region
Dublin
Overview
source: linkeircom Ltd — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
257 gCO₂/kWh
Clean electricity
48%
Fossil electricity
52%
Data-center power price
22.51¢/kWh
A large data center in Ireland pays 22.51¢/kWh for electricity — a household pays 30.46¢, 26% more than the data center (Eurostat).
Data centres used 21% of Ireland's national electricity in 2023 (CSO Ireland).
National grid context, not this facility's own metering. Full country picture: Ireland data centers.
In the news
source: Google News (local + English)- Ireland keeps nuclear door open as data centre energy demand surgesEuronews.com· Aug 26, 2026
- Ireland unveils blueprint to electrify economy by 2050Euronews.com· Jul 29, 2026
- Computing giants ‘pivoting away’ from ‘constrained’ Dublin as data centre hubThe Irish Times· Jul 28, 2026
- AI data centre growth pressures Ireland's grid and climate goals, Oireachtas hearsUniversity College Dublin· Jul 27, 2026
- Vantage faces €152m compensation bill to tenants over delayed Dublin data centre projectThe Irish Times· Jul 24, 2026
- Why is Equinix Exploring Hydrogen at its Dublin Data Centre?Data Centre Magazine· Jul 16, 2026
See something wrong or missing on this page? Suggest a correction.