Mapped (unverified)
Eir Data Centre
Dublin, Ireland
Source: OpenStreetMap
Eir Data Centre is a mapped data center in Dublin, Ireland. DataCentersExposed has documented a 58,673 sq ft footprint at this site. It runs on Ireland's grid, which was 52% fossil-fuelled at 257 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~10-25 MW
Footprint
58,673 sq ft
Grid carbon
257 gCO₂/kWh
Clean electricity
48%
DC power price
22.51¢/kWh
Region
Dublin
Overview
source: linkEir data center in Ireland
The grid behind this site
source: Ember · EurostatGrid carbon intensity
257 gCO₂/kWh
Clean electricity
48%
Fossil electricity
52%
Data-center power price
22.51¢/kWh
A large data center in Ireland pays 22.51¢/kWh for electricity — a household pays 30.46¢, 26% more than the data center (Eurostat).
Data centres used 21% of Ireland's national electricity in 2023 (CSO Ireland).
National grid context, not this facility's own metering. Full country picture: Ireland data centers.
In the news
source: Google News (local + English)- Nation Data Center breaks ground on new French data center developmentBeBeez International· Oct 2, 2026
- ‘Significant risk’ of power outages due to data centre demand, regulator warnsIrish Independent· Oct 1, 2026
- “It feels like torture” - Dublin resident on noise pollution from data centre where EPA plans to continue investigationIrish Independent· Sep 25, 2026
- Nvidia to back OpenAI data centre project with as much as $105bnIrish Independent· Aug 18, 2026
- Kildare residents don't want a data centre next door to themKildare Now· Aug 5, 2026
- Data centres now using almost five million litres of public water per dayIrish Independent· Jul 18, 2026
See something wrong or missing on this page? Suggest a correction.