Edged Energy Nfl
505 N WILDWOOD DR · IRVING, DALLAS COUNTY County, TX
Source: Primary source
Edged Energy Nfl is an operating data center in DALLAS COUNTY County, TX.
Reporting by Eric Keller · Updated Jun 16, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNo description yet.
In the news
source: Google News- PACE Loan Group closes $11.6 million in financing Irving data center conversionREJournals· Jun 10, 2026
- Edged files to develop 2 million sq ft data center campus outside Austin, TexasData Center Dynamics· May 13, 2026
- PowerHouse looking to build 500-acre data center near Austin, TexasData Center Dynamics· May 6, 2026
- PowerHouse tops out first Irving data center in TexasData Center Dynamics· Mar 30, 2026
- Fight against data center in fast-growing west Fort Worth gears upKERA News· Mar 18, 2026
- Fluor Signs Limited Notice to Proceed with TeraWulf for Large-Scale Data Center Project in KentuckyBusiness Wire· Mar 16, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit register- EDGED ENERGY NFLTXR1594US
Nearest school
source: HIFLD / NCESThe nearest public school, Gilbert F M El in Irving, is 0.6 mi from this site (723 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.