Skip to content
DataCentersExposed
Mapped (unverified)colocation

EdgeConneX Warsaw (EDCWAW01)

Warsaw, województwo mazowieckie, Poland

Source: Primary source

EdgeConneX Warsaw (EDCWAW01) is a mapped data center in województwo mazowieckie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Attribution & capacity confidence:mediumprimary source
See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.