DXC Technology
Harris County, TX
Source: OpenStreetMap
DXC Technology is a mapped data center in Harris County, TX. DataCentersExposed has documented 40 MW of reported power capacity and a 113,970 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkDXC Technology is a mapped data center in Harris County, Texas, tied to DXC Technology in available records. Its reported footprint is 113,970 square feet. The site is served by San Bernard Electric Coop, Inc. within the ERCO balancing authority. No operator parent above DXC is disclosed in the listed records.
The grid behind this site, right now
source: ERCOT · gridstatus- Natural Gas43.2%
- Solar37.3%
- Coal9.7%
- Nuclear5.6%
- Wind4.1%
Real-time generation mix for the ERCOT grid this site draws from, as of Aug 17, 2026, 8:04 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- DXC ends takeover discussions with potential suitorTelecompaper· Aug 23, 2026
- Are data centers in Delaware? A guide to what's in the First StateThe News Journal· Jul 9, 2026
- Viral video of a man calling out a proposed Google data center in Iowa is of a data center owner himselfBusiness Insider· Jun 18, 2026
- Data Centre Event: Inside Data Centre LIVE LondonData Centre Magazine· May 18, 2026
- Final Countdown to Data Centre LIVE London SummitData Centre Magazine· May 13, 2026
- Data Centre Event to Explore Hyperscale Growth StrategiesData Centre Magazine· May 13, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Houston-Galveston-Brazoria), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Ischool High At University Park in Houston, is 0.8 mi from this site (374 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.