Mapped (unverified)colocation
DTS DataCenter Herford
Herford, Nordrhein-Westfalen, Germany
Source: Primary source
DTS DataCenter Herford is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkDTS Service GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Austin | Google mietet für viel Geld Rechenleistung bei Musks SpaceXRadio Herford· Jun 6, 2026
- Santa Clara | Nvidia beschleunigt Wachstum mit 85 Prozent UmsatzplusRadio Herford· May 20, 2026
- Bilanzsumme wächst in Bielefeld, Herford und im Mindener LandWestfalen-Blatt· Feb 26, 2026
- „Volksbank in Ostwestfalen“: Pannen bei technischer FusionWestfalen-Blatt· Aug 28, 2024
- Herford: 1400 defekte Schüler-i-Pads - meistens ist das Display beschädigtWestfalen-Blatt· May 28, 2024
- Glasfaseranschluss der weiterführenden Schulen in Enger geschaltetWestfalen-Blatt· Dec 6, 2023
See something wrong or missing on this page? Suggest a correction.