Mapped (unverified)colocation
DTS DataCenter Herford
Herford, Nordrhein-Westfalen, Germany
Source: Primary source
DTS DataCenter Herford is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkDTS Service GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Santa Clara | Nvidia verdoppelt Umsatz und GewinnRadio Herford· Aug 26, 2026
- Berlin | Wildberger fordert mehr Rechenzentren für KI-BoomRadio Herford· Jul 21, 2026
- Bilanzsumme wächst in Bielefeld, Herford und im Mindener LandWestfalen-Blatt· Feb 26, 2026
- Modernisierung der ITstadt+werk· Oct 27, 2025
- Herfords Landrat entlastet auch CDU-KreistagschefWestfalen-Blatt· Oct 17, 2025
- „Volksbank in Ostwestfalen“: Pannen bei technischer FusionWestfalen-Blatt· Aug 28, 2024
See something wrong or missing on this page? Suggest a correction.