DNA Oulu Torikatu
Oulu, Pohjois-Pohjanmaa, Finland
Source: Primary source
DNA Oulu Torikatu is a mapped data center in Pohjois-Pohjanmaa, Finland. It runs on Finland's grid, which was 4% fossil-fuelled at 57 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
57 gCO₂/kWh
Clean electricity
96%
DC power price
6.53¢/kWh
Region
Pohjois-Pohjanmaa
Overview
source: linkDNA Oyj — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
57 gCO₂/kWh
Clean electricity
96%
Fossil electricity
4%
Data-center power price
6.53¢/kWh
A large data center in Finland pays 6.53¢/kWh for electricity — a household pays 23.19¢, 72% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Finland data centers.
In the news
source: Google News (local + English)- Japanilaismerkki toi Suomeen täysin uuden sähköauton – Kisaa samassa segmentissä kuin Tesla Model YKauppalehti· Aug 27, 2026
- Google aloitti maanrakennustyöt Muhoksen datakeskusalueella – Vaatimus töiden keskeyttämiseksi hylättiinKaleva· Aug 10, 2026
- Datakeskusrakentamisessa uhkaa resurssipula – sähköasentajia tarvitaan isoille työmaille niin paljon, että Suomessa osaajat eivät riitäKaleva· Aug 5, 2026
- Hallitus ajaa datakeskushankkeita valvottaviksi – elinkeinoelämä pelkää ulkomaisten sijoittajien kaikkoamistaKaleva· Jul 16, 2026
- Kaleva: Nokia tavoittelee miljardien tekoälytehdasta OuluunLapin Kansa· Jul 9, 2026
- Datakeskuksen ansiosta Iin liian kapeille kinttupoluille suunnitellaan parannuksiaKaleva· Jul 2, 2026
See something wrong or missing on this page? Suggest a correction.