Mapped (unverified)colocation
DNA Oulu Torikatu
Oulu, Pohjois-Pohjanmaa, Finland
Source: Primary source
DNA Oulu Torikatu is a mapped data center in Pohjois-Pohjanmaa, Finland. It runs on Finland's grid, which was 4% fossil-fuelled at 57 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
57 gCO₂/kWh
Clean electricity
96%
DC power price
6.53¢/kWh
Region
Pohjois-Pohjanmaa
Overview
source: linkDNA Oyj — colocation facility (10 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
57 gCO₂/kWh
Clean electricity
96%
Fossil electricity
4%
Data-center power price
6.53¢/kWh
A large data center in Finland pays 6.53¢/kWh for electricity — a household pays 23.19¢, 72% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Finland data centers.
In the news
source: Google News (local + English)- Nyab valittiin Utajärven datakeskuksen pääurakoitsijaksi – "Kasvamme Suomessa tosi kovaa nyt"Kaleva· Oct 9, 2026
- Luotettavaa datakeskus- ja infrastruktuuriosaamistaTekniikka&Talous· Oct 9, 2026
- Jopa 600 MW datakeskus suunnitteilla Jämsään – T&T seuraa uusia hankkeitaTekniikka&Talous· Oct 7, 2026
- Taas miljardien datakeskushanke Pohjois-Suomeen – Iihin suunnitellaan neljää uuttaYle· Sep 24, 2026
- Haluatko töihin datakeskukseen? Koulutus käynnistyy ensi viikollaIlta-Sanomat· Sep 20, 2026
- Datakeskukset | Jättifirmat vyöryvät Suomeen: näin datakeskusten pystyttäminen eteneeHS.fi· Sep 16, 2026
See something wrong or missing on this page? Suggest a correction.