Mapped (unverified)colocation
Digital Space - Newport (NPT)
Newport, Telford and Wrekin, United Kingdom
Source: Primary source
Digital Space - Newport (NPT) is a mapped data center in Telford and Wrekin, United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
Telford and Wrekin
Overview
source: linkDigital Space Group Ltd — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Fit Energy Fuel Cell Data Center Newport Township SolutionsFuel Cells Works· Oct 6, 2026
- Neighbours say huge Newport data centre next to their homes has destroyed the countrysideWales Online· Sep 7, 2026
- "We've lost the sun" - Fears as giant data centre towers over homesSouth Wales Argus· Sep 3, 2026
- The 65ft-high data centre that has ruined our countryside view forever: Village street is left in shadow of huge humming 'monstrosity' that was built just yards away from homesDaily Mail· Sep 3, 2026
- Data centre in Newport that overlooks gardens concerns neighboursBBC· Aug 28, 2026
- UK Infrawatch: altnet creditors take control, regional data centre AI surgeTelco Titans· Aug 26, 2026
See something wrong or missing on this page? Suggest a correction.