Mapped (unverified)colocation
Digital Realty Dublin DUB3
Dublin, Dublin, Ireland
Source: Primary source
Digital Realty Dublin DUB3 is a mapped data center in Dublin, Ireland, operated by Digital Realty Trust, Inc.. It runs on Ireland's grid, which was 52% fossil-fuelled at 257 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Digital Realty Trust, Inc.
Operator
Digital Realty Trust, Inc.
Grid carbon
257 gCO₂/kWh
Clean electricity
48%
DC power price
22.51¢/kWh
Region
Dublin
Overview
source: linkDigital Realty — colocation facility (8 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentDigital Realty Trust, Inc.
- Files asDigital Realty Trust, Inc.
- This facilityDigital Realty Dublin DUB3
The grid behind this site
source: Ember · EurostatGrid carbon intensity
257 gCO₂/kWh
Clean electricity
48%
Fossil electricity
52%
Data-center power price
22.51¢/kWh
A large data center in Ireland pays 22.51¢/kWh for electricity — a household pays 30.46¢, 26% more than the data center (Eurostat).
Data centres used 21% of Ireland's national electricity in 2023 (CSO Ireland).
National grid context, not this facility's own metering. Full country picture: Ireland data centers.
In the news
source: Google News (local + English)- Many Latin Americans Living Near Data Centers Don't Feel Welcome in the FutureTech Policy Press· Sep 12, 2025
- Ireland's data centre ecosystem in 2024kpmg.com· Jan 7, 2025
- CLOUD MAPSSite Selection Magazine· Nov 4, 2024
- GridBeyond BESS to set up Dublin data centres for grid supportEnlit World· Jun 20, 2024
- Dublin Emerges as Cloud Computing HubData Center Knowledge· May 31, 2024
- Digital Realty Strikes $1.4 Billion Data Center Deal with Singapore’s MapletreeData Center Knowledge· May 31, 2024
See something wrong or missing on this page? Suggest a correction.