Digital Fortress: Richmond
1401 Meadowville Technology Parkway · Chesterfield County, VA
Source: OpenStreetMap
Digital Fortress: Richmond is a mapped data center in Chesterfield County, VA. DataCentersExposed has documented a 243,698 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkDigital Fortress: Richmond is a mapped data center in Chesterfield County, Virginia, with a reported footprint of 243,698 square feet. The site draws power from Virginia Electric & Power Co inside the PJM grid. Available records identify it only as a Digital Fortress data center, with no further ownership or parent detail disclosed.
In the news
source: Google News- Polymarket Prices 96% Odds of Q1 Earnings Beat Tonight for AMD24/7 Wall St.· May 5, 2026
- Chirisa data center in Virginia suffers second fire in three weeksData Center Dynamics· Sep 8, 2025
- Chirisa and PowerHouse plan 1GW campus outside Richmond, VirginiaData Center Dynamics· Sep 27, 2024
- Chirisa plans 20MW data center in Chesterfield County, VirginiaData Center Dynamics· Apr 10, 2024
- Data center expanding in Meadowville Tech Park as operator eyes nearby Cartograf siteRichmond BizSense· Apr 9, 2024
- Chirisa acquires two data centers in Washington and New Jersey, expands existing sites in Virginia and IllinoisData Center Dynamics· Jan 27, 2024
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~45 to 100 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Richmond), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Elizabeth Scott Elementary in Chester, is 1.6 mi from this site (781 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.