Skip to content
DataCentersExposed
Mapped (unverified)

Digital Crossroad

100 Digital Crossroad Drive · Hammond, Lake County, IN

Source: OpenStreetMap

Digital Crossroad is a mapped data center in Lake County, IN. DataCentersExposed has documented 180 MW of reported power capacity and a 116,014 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
Operator
Power
180 MW
Footprint
116,014 sq ft
Interconnection
~175 MW
Utility
Northern Indiana PUB Serv Co
Grid
MISO
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Digital Crossroad is a mapped data center in Hammond, Lake County, Indiana, with a reported footprint of 116,014 square feet. It draws power from Northern Indiana Public Service Company inside the MISO grid. Available records do not name an operator or ultimate corporate parent for the site.

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
24%
Fossil right now
62%
Grid operator
MISO
  • Natural Gas33.4%
  • Coal28.2%
  • Solar13.1%
  • Imports11.0%
  • Nuclear9.7%
  • Other3.0%
  • Wind1.6%

Real-time generation mix for the MISO grid this site draws from, as of Jul 15, 2026, 9:20 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

Grid & water — why here

source: HIFLD · EPA
Nearest substation
319 ft
State Line Energy · 138 kV
Transmission line
280 ft
line
Municipal water
No service area
self-supplied or unmapped

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~3.4M gpd
Direct (onsite cooling)
~1.6M gpd
Indirect (its electricity)
~1.8M gpd

No measured record exists, so this is a low-confidence model from 175 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
67
PM2.5
Moderate
45
O3
Good

Air Quality Index from the nearest AirNow reporting area (Chicago), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$55.4K
People of color
64%
Below poverty
16%
Tract population
5,432

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Sadlowski Elementary School in Chicago, is 0.4 mi from this site (625 students). 4 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.

See something wrong or missing on this page? Suggest a correction.