Mapped (unverified)
Dernbach 1
Rheinland-Pfalz, Germany
Source: OpenStreetMap
Dernbach 1 is a mapped data center in Rheinland-Pfalz, Germany, operated by GasLINE. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
GasLINE
Operator
GasLINE
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Rheinland-Pfalz
Overview
source: linkDernbach 1 is a mapped data center in Germany operated by GasLINE. Available records note it as a GasLINE data center, with no further ownership detail disclosed. Capacity, footprint, and any environmental records are not listed in the available data.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Aktie von Bloom Energy unter Druck: Oracle setzt für Rechenzentren auf Erdgaslieferungen per LKWYahoo Finanzen Deutschland· Oct 8, 2026
- Oracle stoppt Jupiter: 18 Milliarden Dollar scheitern an einer Pipeline-GenehmigungBörse Express· Sep 25, 2026
- Bloom Energy Aktie: 25-Gigawatt-Pipeline für KI-RechenzentrenBörse Express· Aug 28, 2026
- Lenovo Aktie: KI-Server-Pipeline um 157 Prozent gewachsenBörse Global· Aug 19, 2026
- Bloom Energy Aktie: New Mexico verweigert Pipeline-GenehmigungFinanztrends· Aug 11, 2026
- Hochtief Aktie: Meta-Rechenzentrum und Pipeline am 16. JuliKapitalmarktexperten· Jul 17, 2026
See something wrong or missing on this page? Suggest a correction.