Dernbach 1
Rheinland-Pfalz, Germany
Source: OpenStreetMap
Dernbach 1 is a mapped data center in Rheinland-Pfalz, Germany, operated by GasLINE. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkDernbach 1 is a mapped data center in Germany operated by GasLINE. Available records note it as a GasLINE data center, with no further ownership detail disclosed. Capacity, footprint, and any environmental records are not listed in the available data.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Fuelcell Energy Aktie: 267-Prozent-Pipeline auf 4 GigawattBörse Express· Jun 14, 2026
- Hyliion-CEO: $40-50 Mio. Militär-Pipeline und netzunabhängige Rechenzentrenaktien.news· Jun 9, 2026
- Fluence Energy Aktie: 12-Gigawatt-Pipeline für KI-RechenzentrenBörse Express· May 31, 2026
- PowerBank Aktie: Gigawatt-Pipeline für KI-RechenzentrenAD HOC NEWS· May 26, 2026
- Mit Q-KI, Quanten und Neuromorphik das Rechenzentrum neu gedachtDataCenter-Insider· Dec 22, 2025
- Putins Kriegskasse erhält Nachschub: Russisches Gas erreicht Europa trotz SanktionenFrankfurter Rundschau· Nov 24, 2025