Mapped (unverified)colocation
DCI Indonesia (E2)
Surabaya, Jawa Timur, Indonesia
Source: Primary source
DCI Indonesia (E2) is a mapped data center in Jawa Timur, Indonesia. It runs on Indonesia's grid, which was 82% fossil-fuelled at 681 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
681 gCO₂/kWh
Clean electricity
18%
Region
Jawa Timur
Overview
source: linkDCI Indonesia — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
681 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: Indonesia data centers.
In the news
source: Google News (local + English)- ESB Data Center Ungkap 78% Transaksi F&B Surabaya Kini Non-Tunai - Kabarindo.comKabarindo.com· Aug 21, 2026
- ESB Data Center: 78 Persen Transaksi F&B Surabaya Non-TunaiVIVA Jatim· Aug 21, 2026
- ESB Data Center Ungkap 78% Transaksi F&B Surabaya Kini Non-Tunai, Sinyal Bisnis Kuliner Makin Matang Secara DigitalKilasJatim.com· Aug 21, 2026
- Siapkan Data Center Berbasis Server AI, Pemkot Surabaya Dukung Transformasi Digital NasionalTIMES Indonesia· Aug 2, 2026
- TLKM-PGN Garap Green Data Center, Cikarang hingga Surabaya Masuk RadarEmitennews.com· Apr 13, 2026
- Upaya Memperkuat Infrastruktur Pusat Data di Indonesia Timur Terus DigencarkanMedia Indonesia· Apr 12, 2026
See something wrong or missing on this page? Suggest a correction.