Mapped (unverified)
野村総合研究所 東京第一DC
Tokyo, Japan
Source: OpenStreetMap
野村総合研究所 東京第一DC is a mapped data center in Tokyo, Japan. DataCentersExposed has documented a 100,493 sq ft footprint at this site. It runs on Japan's grid, which was 67% fossil-fuelled at 477 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~20-45 MW
Footprint
100,493 sq ft
Grid carbon
477 gCO₂/kWh
Clean electricity
33%
Region
Tokyo
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
477 gCO₂/kWh
Clean electricity
33%
Fossil electricity
67%
National grid context, not this facility's own metering. Full country picture: Japan data centers.
In the news
source: Google News (local + English)- Oracle Cloud Infrastructure(OCI)/東京・大阪リージョン – 概要/価格/マニュアル/トライアル/事例Oracle Blogs· May 14, 2026
- 石狩再エネデータセンター第1号 竣工のお知らせData Center Cafe· Mar 31, 2026
- 「ガス火力発電」関連銘柄を紹介! AI向けデータセンターの電源として活用可能で、対米投資の“第1号案件候補”でもある「ガス火力発電」は成長期待の国策テーマ!ダイヤモンド・オンライン· Feb 13, 2026
- DX追い風・IT投資旺盛…情報サービス7社の通期見通し、6社が当期増益ニュースイッチ by 日刊工業新聞社· Nov 15, 2025
- 【提言】ワット・ビット連携:AI時代のインフラ国富論mri.co.jp· Oct 8, 2025
- NTTデータGは当期利益40%増…情報サービス7社の通期見通し、IT投資意欲堅調で全社増収ニュースイッチ by 日刊工業新聞社· May 21, 2025