Mapped (unverified)colocation
Datavault Kanavuori inc.
Jyväskylä, Keski-Suomi, Finland
Source: Primary source
Datavault Kanavuori inc. is a mapped data center in Keski-Suomi, Finland. It runs on Finland's grid, which was 4% fossil-fuelled at 57 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
57 gCO₂/kWh
Clean electricity
96%
DC power price
6.53¢/kWh
Region
Keski-Suomi
Overview
source: linkTNNet Oy — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
57 gCO₂/kWh
Clean electricity
96%
Fossil electricity
4%
Data-center power price
6.53¢/kWh
A large data center in Finland pays 6.53¢/kWh for electricity — a household pays 23.19¢, 72% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Finland data centers.
In the news
source: Google News (local + English)- Skanska rakentamaan uutta datakeskustaSTT Info· Aug 26, 2026
- T&T selvitti: Näin datakeskusyhtiöt tekevät rahaa Suomessa – Miljardeja virtaa nyt kuumalle alalleTekniikka&Talous· Aug 17, 2026
- Fingrid aikoo rakentaa leveän sähkönsiirtolinjan, joka halkoo satojen kilometrien matkan Pohjois-Suomesta KymenlaaksoonYle· Jul 22, 2026
- Jyväskylän datakeskushanke: ei valitustaKeskisuomalainen· Jun 30, 2026
- Itäinen SeppälänkangasJyväskylän kaupunki· Jun 18, 2026
- Helsinki | Koska lunta ei saa enää kipata mereen, se läjitetään metsäänHS.fi· Jun 2, 2026
See something wrong or missing on this page? Suggest a correction.