Dataone AMS1
Wormer, Noord-Holland, Netherlands
Source: Primary source
Dataone AMS1 is a mapped data center in Noord-Holland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Noord-Holland
Overview
source: linkDataone BV — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Roemers (24) website weet hoelang je moet wachten op een huurhuis: ’Ik hoop dat m’n servers ontploffen’Noordhollands Dagblad· Feb 10, 2025
- Waarom cybercriminaliteit bij hostingbedrijf Wormer slechts het topje van de ijsberg isNH Nieuws· Apr 7, 2021
- Het afvoerputje van het internet zit in een Noord-Hollands dorpNRC· Apr 2, 2021
- Het dubbelleven van de televisietorensNRC· Nov 27, 2020
- Trans-Pacific air cargo sees huge US demand for data center componentsJournal of Commerce· Jun 12, 2026
- Houston Housing Market Maintains Momentum with Increased Buyer ActivityNewsRadio 740 KTRH· Apr 28, 2026
See something wrong or missing on this page? Suggest a correction.