DataBank Pittsburgh PIT2

35 Summit Park Drive · Pittsburgh, Allegheny County, PA

Source: OpenStreetMap

DataBank Pittsburgh PIT2 is an operating data center in Allegheny County, PA, operated by DataBank Holdings, Ltd.. DataCentersExposed has documented 5 MW of reported power capacity and a 60,007 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Real parent
DataBank Holdings, Ltd.
Operator
DataBank Holdings, Ltd.
Power
5 MW
Footprint
60,007 sq ft
Utility
West Penn Power Company
Grid
PJM
Attribution & capacity confidence:mediumprimary source

Overview

source: link

data center

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
938 ft
Unknown123773 · 138 kV
Transmission line
887 ft
line
Municipal water
Served
Western Allegheny County Mun A

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~93.6K gpd
Direct (onsite cooling)
~45.6K gpd
Indirect (its electricity)
~48K gpd

No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
PJM RTO (rest of footprint) · 2027/28 auction
$333 /MW-day

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's RTO pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost
$607.7K/yr

5 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
45
O3
Good
43
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Pittsburgh), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$93.8K
People of color
22%
Below poverty
6%
Tract population
7,279

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Parkway West Ctc in Oakdale, is 0.9 mi from this site (7 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.