Mapped (unverified)colocation
Cube Global
Victoria, British Columbia, Canada
Source: Primary source
Cube Global is a mapped data center in British Columbia, Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
British Columbia
Overview
source: linkCube Global Storage — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Vancouver’s DMG Blockchain sets Aug. 27 date for Q3 earningsBusiness Examiner· Aug 21, 2026
- Data centres hoover up water, electricity and sparkies, which could slow home buildingBrisbane Times· Aug 19, 2026
- SKS Technologies posts third year of record earnings on data centre-led growthThe Globe and Mail· Aug 18, 2026
- Australia and Canada diverge on plans to power AICanada's National Observer· Aug 13, 2026
- Canada plus AI data centres equals prosperity and security—so what’s the hold up?The Hub | More Signal. Less Noise.· Aug 4, 2026
- Meta expanding Louisiana data center to 5 GW in US$ 50 billion AI pushw.media· Jul 14, 2026
See something wrong or missing on this page? Suggest a correction.