Mapped (unverified)colocation
CPD Titan
Murcia, Región de Murcia, Spain
Source: Primary source
CPD Titan is a mapped data center in Región de Murcia, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Región de Murcia
Overview
source: linkCPD Titan — colocation facility (8 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Bruselas avala el criterio de la Región de Murcia para regular los centros de datosLa Opinión de Murcia· Sep 25, 2026
- Bruselas propone crear una etiqueta europea para medir el consumo de energía y agua de los centros de datosLa Opinión de Murcia· Sep 21, 2026
- La Comunidad pide evitar que el calor penalice la llegada de centros de datos a la RegiónLa Opinión de Murcia· Sep 10, 2026
- La primera piedra del centro de chips ciberseguros de Quantix en Murcia se colocará en otoñoCOMPUTERWORLD ESPAÑA· Jul 23, 2026
- El Corte Inglés acelera su negocio de centros de datos con un proyecto en MurciaEjePrime· Jun 12, 2026
- El Corte Inglés abre un centro de datos en Paterna e inicia su comercializaciónEconomía Digital· Jun 12, 2026
See something wrong or missing on this page? Suggest a correction.