Mapped (unverified)
CPD Gobierno de Navarra
Navarra / Nafarroa, Spain
Source: OpenStreetMap
CPD Gobierno de Navarra is a mapped data center in Navarra / Nafarroa, Spain, operated by Nasertic. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
Nasertic
Operator
Nasertic
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Navarra / Nafarroa
Overview
source: linkCPD Gobierno de Navarra is a mapped data center in Spain, run by Nasertic. Available records identify it as a Nasertic data center. No capacity, footprint, or ultimate parent details are disclosed in the facts on hand.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Navarra moderniza su centro de datos para afrontar el crecimiento digital y las nuevas cargas de IAituser.es· Mar 17, 2026
- El PIC entra en el mapa de las Infraestructuras Científicas y Técnicas SingularesUniversitat Autònoma de Barcelona· Mar 16, 2022
- Premios a los mejores del negocio del centro de datos en EspañaBPS Channel Partner· Jan 22, 2015
- Spain's government of Navarre doubles data center capacityData Center Dynamics· Apr 29, 2025
See something wrong or missing on this page? Suggest a correction.