CoreWeave Marble NC
155 PALMER LN, MARBLE, NC, 28905 · MARBLE, Cherokee County, NC
Source: Primary source
CoreWeave Marble NC is a mapped data center in Cherokee County, NC. DataCentersExposed has documented 91 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkCoreWeave Marble NC — frontier AI data center campus tracked by Epoch AI, operated by CoreWeave. Estimated capital cost ~$2.5B (2025 USD). Located from Epoch AI's Frontier Data Centers dataset (CC-BY 4.0); operational status not independently verified.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Austin City Council unanimously moves forward with new data center regulationsKEYE· Aug 29, 2026
- Project Washington pulls appeal, data center won’t proceed under current planSpotlight Delaware· Aug 28, 2026
- Austin City Council to weigh data center regulations, possible ban in work sessionKEYE· Aug 25, 2026
- Harrington denies data center proposal despite a $1M offerSpotlight Delaware· Aug 19, 2026
- Data center operators sneak in pair of projects hours before moratorium enacted in Hillsboro, OregonData Center Dynamics· Aug 12, 2026
- Data center proposals filed days, hours before Hillsboro moratorium approvedForest Grove News-Times· Aug 8, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 91 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, The Oaks Academy in Marble, is 0.6 mi from this site (50 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.