CoreSite - Denver (DE2)
Denver, CO
Source: Primary source
CoreSite - Denver (DE2) is a mapped data center in CO, operated by CoreSite, LLC. DataCentersExposed has documented 75 MW of reported power capacity and a 180,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkCoreSite — colocation facility (14 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentCoreSite, LLC
- Files asCoreSite, LLC
- This facilityCoreSite - Denver (DE2)
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Could a new Denver data center use up to 800,000 gallons of water a day?The Colorado Sun· Jun 29, 2026
- Jane Fonda visits Denver to highlight a battle against a local data centerDenverite· Jun 25, 2026
- Actress Jane Fonda boosts Elyria-Swansea's fight over data centerAxios· Jun 25, 2026
- What’s the status of massive data centers in Colorado? Here’s what you need to know.The Colorado Sun· Jun 18, 2026
- CoreSite seeks approval to add second data center building at Orlando campusGrowthSpotter· Jun 2, 2026
- Data center regulations elude Colorado lawmakers — again — as state grapples with booming industryThe Denver Post· May 25, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Downtown Denver Expeditionary School in Denver, is 0.4 mi from this site (259 students). 8 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.