Core Scientific / CoreWeave Muskogee
Muskogee, Muskogee County County, OK
Source: Primary source
Core Scientific / CoreWeave Muskogee is a under construction data center in Muskogee County County, OK, operated by Core Scientific, Inc.. DataCentersExposed has documented 100 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: link100MW (~70MW IT) hosting CoreWeave NVIDIA GPUs at Port Muskogee.
Operator chain
- Files asCore Scientific, Inc.
- This facilityCore Scientific / CoreWeave Muskogee
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Core Scientific Completes $444 Million Polaris Acquisition, Targets 1.5 GW Muskogee Campuscitybiz· Aug 14, 2026
- Core Scientific closes $444 million deal for Polaris, targets 1.5 GW Muskogee campusYahoo Finance· Aug 14, 2026
- Core Scientific lands AMD AI deal as bitcoin mining operation winds downCoinDesk· Jul 28, 2026
- Land and Expand: NVIDIA, IREN, Coatue, Microsoft, Switch, Cerebras, Core ScientificData Center Frontier· May 14, 2026
- Core Scientific’s Muskogee Bet: Can Crypto-Era Infrastructure Fuel AI?Data Center Knowledge· May 7, 2026
- Hut 8 Shares Surge 35% Following $9.8 Billion DealForkLog· May 7, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Muskogee Ec Ctr in Muskogee, is 527 ft from this site (275 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.